Skip to content

Residential & commercial electricians

Real Estate

Support for rentals, strata and managers.

PBM Power / Safety & repairs

Electrical Make Safe Perth

Damaged electrical fittings or wiring need a careful assessment before the affected installation is used again. For electrical make safe Perth-wide, PBM Power can assess reported hazards, damage and the isolation needs of work planned for a building. Explain what has happened from a safe location so the situation and the appropriate next step can be considered.

Illustrative Australian residential electrical switchboard with covered wiring

Address the affected installation before further work

Impact damage, water exposure or building work can leave electrical equipment in an uncertain condition. Keep people away from the affected area and avoid touching damaged fittings or exposed wiring. Do not open covers to investigate. Make-safe work focuses on the assessed electrical concern and may involve isolating or disconnecting affected parts, depending on what is found at the property.

Separate the immediate scope from permanent repairs

Making an affected area safe does not necessarily restore the installation to normal use or complete every repair. Following assessment, further electrical work or involvement from other trades may be needed. We can explain the identified scope and discuss the next steps with the authorised contact. For builder, insurer or property-manager requests, provide the required work order and reporting instructions before attendance.

Describe the incident without entering the affected area

Useful booking information explains what happened, when it happened and what electrical equipment appears to be involved. An impact, a leak and planned demolition create different assessment questions. Share photographs only if they can be taken from a safe position without approaching damage or exposed wiring. Tell the booking contact whether people are still using the affected area and whether other contractors are present. If the concern involves a wider loss of power, identify that separately for electrical fault assessment. Do not attempt to recreate the incident.

Coordinate a make-safe with the repair or demolition team

A builder or restoration contractor may need to know which parts of the installation are affected before their own work can proceed. Provide the intended work area and identify who is coordinating the project. The electrical scope should relate to the actual damage or proposed building work, including any access needed beyond the visible area. Planned renovation and demolition stages should not rely on an assumption that a previous visit disconnected everything required. If the building scope changes after the electrical assessment, raise that change before work continues so the relevant electrical requirements can be reviewed for the revised area.

Understand the position after the immediate work

Ask what has been isolated or disconnected, which equipment must remain out of use and what further work is proposed. Keep those instructions available to the property contact and other contractors who need them. Reconnection and permanent repairs should be arranged as a defined follow-up scope; completing an immediate make-safe does not establish that damaged equipment is ready to operate again.

For electrical make-safe enquiries in Midland, Scarborough or Cannington, explain the incident and provide the property address from a safe location so PBM Power can confirm availability and discuss the appropriate assessment.

What we can help with

  • Assessment of reported electrical damage or hazards
  • Electrical isolation or disconnection where assessed as necessary
  • Make-safe planning before agreed building works
  • Coordination with property managers and repair teams
  • Explanation of further electrical work identified

Help us understand your job

  • Describe the incident and affected area from a safe position.
  • Provide access details and the person authorised to approve work.
  • Share builder, insurer or property-manager instructions if relevant.

Your questions, answered.

No. The immediate scope may address an identified hazard while permanent repairs require further work. Ask what has been completed and what remains before reusing affected equipment.

Do not handle damaged electrical equipment or exposed wiring. Keep clear of the area and explain what you can observe safely when discussing the booking.

Yes. Share the demolition scope and contractor details early so the required electrical assessment and disconnection work can be coordinated before the affected work begins.

Talk to PBM

Good work starts with
a clear conversation.

Tell us your suburb, the type of property and what you need. Photos and appliance model details can help us understand the job.

This field is for validation purposes and should be left unchanged.